Pages

Saturday, 20 February 2021

Discussing the taking down of the grid

I have not watched either of these yet. 

Grid down

Jana ben-Noon with Deborah Tavares



This can be viewed HERE

BREAKING NEWS TEXAS ORDERED BY DEPT OF ENERGY – NOT MAKE MORE POWER 2/19/21


Trumpet News - I have kept a copy of this broadcast in the case it is taken down from You Tube


And this is why Texans are being billed thousands. I see a major lawsuit. How could Texans know this information is there was no power in the first place. Please GOD let this blow up in their FACE!


(i) with respect to any Specified Resource that is an ERCOT Generation Resource or Settlement Only Generator whose operator notifies ERCOT that the unit is unable, or expected to be unable, to produce at its maximum output due to an emission or effluent limit in any federal environmental permit, ERCOT shall ensure that such Specified Resource is only allowed to exceed any such limit during a period for which ERCOT has declared an Energy Emergency Alert (EEA) Level 2 or Level 3. This incremental amount of restricted capacity would be offered at a price no lower than $1,500/MWh. Once ERCOT declares that such an EEA Level 2 or Level 3 event has ended, the unit is required to immediately return to operation within its permitted limits; and



(ii) with respect to any Specified Resource that is an ERCOT Generation Resource whose operator notifies ERCOT that the unit is offline or would need to go offline due to an emission or effluent limit in any federal environmental permit, and to which ERCOT has issued a Reliability Unit Commitment (RUC) instruction, the operator may make all of the unit’s capacity available to ERCOT for dispatch during a period for which ERCOT has declared an EEA Level 2 or Level 3. This incremental amount of restricted capacity would be offered at a price no lower than $1,500/MWh. Once ERCOT declares that such an EEA Level 2 or Level 3 event has ended, the unit is required to immediately return to operating at a level below the higher of its minimum operating level or the maximum output allowable under the permitted limit


---Godlike Productions




https://www.energy.gov/sites/prod/files/2021/02/f82/DOE%20202(c)%20Emergency%20Order%20-%20ERCOT%2002.14.2021.pdf



WE NOW HAVE PROOF WHAT HAPPENED IN TEXAS WAS A DIRECT ASSAULT BY THE BIDEN ADMINISTRATION. THIS WAS THE OPENING VOLLEY OF BIDEN'S "DARK WINTER", NOW PROVEN

The Biden administration, via the DOE, issued the order to wreck Texas. THIS IS WHAT VOTE FRAUD LOOKS LIKE.




https://imgur.com/a/jhwuCvh

No comments:

Post a Comment

Note: only a member of this blog may post a comment.